BELEN WIND POWER PLANT

Total Installed Capacity: 48 MW

Date of Establishment: 01.10.2009

It is located in Belen district of Hatay province and has a total power of 48 MW.

ALBAY ÇİĞİLTEPE WIND POWER PLANT

Total Installed Capacity: 200.25 MW

Date of Establishment: 22.12.2012

It is located in Dinar district of Afyonkarahisar province. The annual production amount of the power plant is approximately 564.000.00 kw/hour.

Albay Çiğiltepe RES

KOCATEPE WIND POWER PLANT

Total Installed Capacity: 100 MW

Date of Establishment: 13.07.2020

Kocatepe WPP is located in Sandıklı district of Afyonkarahisar. Operated by İzdem Energy Investment Production, a subsidiary of Mogan Energy, the plant is the 173rd largest power plant in Turkey and the 2nd largest power plant in Afyonkarahisar with an installed capacity of 88 MWe.

ŞENKÖY WIND POWER PLANT

Total Installed Capacity: 36 MW

Date of Establishment: 04.05.2012

Şenköy WPP, one of the projects of EOLOS WIND ENERGY A.Ş., is located within the borders of Hatay province and has a total power of 36 MW. The power plant aims to generate 110,000,000 Kw/hour of electricity per year.

SEYİTONBAŞI WIND POWER PLANT

Total Installed Capacity: 10 MW

Date of Establishment: 15.03.2017

SEYİT ONBAŞI WPP, located in Çanakkale province, has an installed capacity of 9.4 MW and generates an average of 32,900,000 000 kWh of electricity per year.

ULU WIND POWER PLANT

Total Installed Capacity: 120.4 MW

Date of Establishment: 23.12.2020

Ulu Wind Power Plant, which will be built within the provincial borders of Bursa and Kocaeli, will have an installed capacity of 120.4 MW and will generate a total of 367,000,000 kWh of electricity per year.

FATMA WIND POWER PLANT

Total Installed Capacity: 80 MW

Date of Establishment: 29.09.2011

Fatma WPP, one of the projects of DERNE TEMİZ ENERJİ ÜRETİM A.Ş., is located in Muğla province.

KANİJE WIND POWER PLANT

Total Installed Capacity: 64 MW

Date of Establishment: 09.02.2011

The 64 MW Kanije WPP, which is included in the investment, construction and operation program of DERNE TEMİZ ENERJİ A.Ş., is located in Uzunköprü/Edirne and Hayrabolu/Tekirdağ. A total annual generation of 224.300.000 kw/h is foreseen.

ZELİHA WIND POWER PLANT

Total Installed Capacity: 25.6 MW

Date of Establishment: 04.07.2016

The 25.6MW Zeliha WPP, which is included in the investment, construction and operation program of DERNE TEMİZ ENERJİ A.Ş., is located in Kırklareli. A total production of 92,000,000 kw/h per year is foreseen.