Total Installed Capacity: 32.919 MW
Date of Establishment: 20.02.2015
ARPA HEPP, located on Arpa Stream in Artvin province, Borçka district, has an installed capacity of 32.9 MW.
Total Installed Capacity: 25.78 MW
Date of Establishment: 15.06.2016
ÇERMİKLER HEPP, located in Sivas province, has an installed capacity of 25.78 MW and generates an average of 80,651,000 kWh of electricity per year.
Total Installed Capacity: 8.6 MW
Date of Establishment: 24.06.2013
Çeşmebaşı HEPP and Regulator on Kızılırmak has an installed capacity of 8.6 MW and an annual electricity generation capacity of 56,160,000 kw/hour.
Total Installed Capacity: 14.07 MW
Date of Establishment: 12.05.2016
It has an installed capacity of 14.07 MW and generates an average of 57,500,000 kWh of electricity per year.