HYDROELECTRIC POWER PLANTS

 

ARPA HYDROELECTRIC POWER PLANT

Total Installed Capacity: 32.919 MW

Date of Establishment: 20.02.2015

ARPA HEPP, located on Arpa Stream in Artvin province, Borçka district, has an installed capacity of 32.9 MW.

ÇERMİKLER HYDROELECTRIC POWER PLANT

Total Installed Capacity: 25.78 MW

Date of Establishment: 15.06.2016

ÇERMİKLER HEPP, located in Sivas province, has an installed capacity of 25.78 MW and generates an average of 80,651,000 kWh of electricity per year.

ÇEŞMEBAŞI HYDROELECTRIC POWER PLANT

Total Installed Capacity: 8.6 MW

Date of Establishment: 24.06.2013

Çeşmebaşı HEPP and Regulator on Kızılırmak has an installed capacity of 8.6 MW and an annual electricity generation capacity of 56,160,000 kw/hour.

ESPİYE HYDROELECTRIC POWER PLANT

Total Installed Capacity: 14.07 MW

Date of Establishment: 12.05.2016

It has an installed capacity of 14.07 MW and generates an average of 57,500,000 kWh of electricity per year.