HYDROELECTRIC POWER PLANTS

 

ARPA HYDROELECTRIC POWER PLANT

Total Installed Capacity: 32.919 MW

Arpa HEPP, which was established within the borders of Borçka district of Artvin province, was put into operation on 16.08.2012.

ÇERMİKLER HYDROELECTRIC POWER PLANT

Total Installed Capacity: 25.78 MW

Çermikler HEPP, which was established in Şarkışla district of Sivas province, started operation on 24.10.2013. It reached 25.78 MW on 12.12.2013.

ÇEŞMEBAŞI HYDROELECTRIC POWER PLANT

Total Installed Capacity: 8.6 MW

Çeşmebaşı HEPP, which was established in Kalecik district of Ankara province, started operation on 12.01.2011.

ESPİYE HYDROELECTRIC POWER PLANT

Total Installed Capacity: 14.07 MW

Akköy- Espiye HEPP, which was established in Yağlıdere district of Giresun province, started operation on February 15, 2012. It reached 14.07 MW on 10.05.2013.