GEOTHERMAL POWER PLANTS

“TURKEY’S MOST EFFICIENT GEOTHERMAL POWER PLANTS”

 

GALİP HOCA GEOTHERMAL POWER PLANT

Total Installed Capacity: 47.4 MW

Date of Establishment: 02.04.2009

Construction of all civil, mechanical and electrical installation works within the scope of 47.4 mw Galip Hoca GPP, which is included in the investment, construction and operation program of Gürmat Elektrik Üretim A.Ş. The plant was commissioned on April 2, 2009.

EFELER GEOTHERMAL POWER PLANT

Total Installed Capacity: 212.5 MW

Date of Establishment: 26.08.2015

Efeler Geothermal Power Plant is located in Germencik, Incirliova district of Aydın. Operated by Gürmat Elektrik Üretim A.Ş., a subsidiary of Mogan Energy, the power plant is the 137th largest power plant in Turkey and the largest power plant in Aydın with an installed capacity of 114.90 MWe.